PAVING TODAY! 

Last week the final cross pipe and drainage blanket were installed.  The fine grading was completed over the weekend.  (Attached photo 5/21.)  And we are so pleased to tell you that Casella is paving today! (Attached photo 5/23.) 

Priority has been placed on opening two lanes for the holiday weekend, requiring that cleanup work be performed during the next week or two.  The guardrail is expected to be installed on Thursday and is necessary to open the roadway on Friday, May 27, 2022. 

After the holiday weekend, the roadway will be reduced to one lane or closed at times with traffic control to allow for site cleanup and the removal of materials. 

With thanks for your cooperative spirit during the Charlestown Route 12 repairs,

My Best,

Kathy

Kathleen Mulcahey-Hampson

Legislative Liaison

Senior Hearings Examiner, NHDOT

About Rep. Steven Smith

Steven Smith is a member of the New Hampshire House of Representatives, serving his 7th term. Rep. Smith currently represents Charlestown, Newport, and Unity. Rep. Smith is the Deputy Speaker of the NH House.
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply or Ask a Question

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s